HOME  >  CORPORATE  >  News

Are you worried your container building is not insulated...

2018-05-17

Yesterday, a message was sent from Ontario, Canada. The flatpack container office building was completed. It is winter in Ontario. Heavy snow is coming. But our customer did not stop. Due to the advantages of flatpack container house, that it is prefabricated and there was no plumbing works. So the installation of the flatpack container office building was very fast, took only 7 days. The foundation is special. It is made from wooden cubes and is located in the soil. The integrated wooden cube is large enough and stable enough, with sufficient contact surface with the ground, thus making it more stable. The wooden foundation is very light, it disperses the press from container building, passes it to the ground. It is also built higher above the ground, which prevents the rusty water from flowing into the foundation. In the cold weather, a big container office building can be built within one week, saving more time from interior decoration. The customer is very satisfied. 





© 2005-2021 Shanghai Haicheng Special Steel Container Co., Ltd. All Rights Reserved

Sitemap | Glass Doors | Flatpack Container